Cypher installs are built like real controls projects: clean panels, documented points, verified I/O, and operator training. No fluff — just systems that work and are serviceable.
Planning & Documentation
We start with equipment scope (RTUs/AHUs/exhaust/lighting), required control points, and a clean point list. This defines sensors, outputs, network layout, and what the dashboard will expose to the operator.
Clean Fabrication
Panels are built clean and serviceable. SC-1 (supervisory) and FC-1 (field) controllers are mounted and labeled. We terminate I/O cleanly and prep the communication bus (RS-485 / Ethernet) so field work is faster and cleaner.
On-Site Execution
We mount panels, land field wiring, and install sensors. Communications are brought online and verified end-to-end. This step focuses on clean terminations and correct signal types — so commissioning is predictable.
Checkout & Handoff
We do a point-to-point checkout, validate sequences, and confirm safeties. Then we train staff on the dashboard: schedules, overrides, alarms (if used), and how to verify the system is operating correctly.